Here we see the footings poured in and worked over. Next will be the walls, then the base slab. It rained today, so I don't know if that affected anything?
View from side.
From back to front: pipes showing sumps; basement stairway, bath tub, toilet, sink, washer & dryer and temporary pipe for testing leaks.
Main sump.
Update: I learned that four cement trucks had poured 40 cubic feet of concrete for just the footing. A typical house on my neighborhood probably has 20 cubic feet amount of cement.