Sunday, February 19, 2012

Lights and Sprinklers.

 Lights








 Sprinklers






The ripped out polystyrene.


Living Room

Friday, February 17, 2012

Tyvek wrapped.

Wrapped up.

Greg measuring and installing LED cans.

View of the laundry shoot.
 
Obstacles.

Thursday, February 16, 2012

Tyvek continues; and stuff.

The vent in the main floor bathroom is now parallel to one of the walls. Although, I did not expect that it would be done this way.

View of the holes in the concrete in the basement bathroom.

Sprinkler system set up.

Wrapping Tyvek around the second floor.
 Tyvek.

Wednesday, February 15, 2012

Tyvek wrap and stuff.

Well the first floor is wrapped up in Tyvek.

More plumbing fixtures going in. Here is the automatic faucets stubs.
Shower

Stairwell lights.

Sprinkler system now in basement.

Looks like the toilet and drain was off, so they had to dig into the concrete and adjust?
Not completely sure whats going on but will get info tomorrow.

Tuesday, February 14, 2012

Pictures of my windows being manufactured in Germany.








Cool!

Wet day, Feb 13th.

Raining
This is the lock on my fence.
Back deck. Wet.
Second floor deck. Wet.
Tyvek will be going up soon.

Saturday, February 11, 2012

Sprinkler system pipes and thing.

I this box is my ceiling thing that goes in my bedroom closet.
Below are pics of the orange piping used for the sprinkler system.






There you go.