Friday, July 27, 2012

Whole bunch of photos.

July 26th.











July 27th.









Tuesday, July 24, 2012

Sheet rock

  
 

Saturday, July 21, 2012

Update; July 21st, 2012.

Cement layer over main bathroom floor.
Soffit over both windows.
Cement floor and drains installed in second floor bathroom.

Hurray! the missing window is here and installed!

Soffit over master bedroom window.

Ethernet, cable and phone panel in basement.
Stucco supplies.
et voilá.

Tuesday, July 17, 2012

Main Bathroom Floor

The bathroom floor is being prepped for the tiles.
Cool!

The electrician made a mistake and drilled the hole (for another fixture) not aligned with the light fixture on the left. Oops.

Below are baby doves. they have successfully crapped all about my second floor.
They're cute but annoying. amazingly the parents haven't abandoned them.

Thursday, July 12, 2012

Insulation and stuff.

Here are pics of the insulation that has been installed. The product is John Manville (I like the name). http://www.jmhomeowner.com

Front entry.
Guest bedroom.
Basement bathroom.
Basement bathroom; view from bathtub.
Basement 'game' room.
Master bedroom.

Below: the blue tube is the fresh water that will connect to the hose bib in the basement pond.
They had to drill a diagonal hole through the cement to get to the hose bib (see below).
The white panel, next to the grey electrical high voltage panel, is the ethernet and cable TV hub. Cool.

View of the plywood face that will provide structural integrity to the stucco over the green roof curb & eaves.
I'm slowly losing my mind.