Monday, January 16, 2012

Happenings and events.

George is building out the front deck. Here he is cutting off the extra length from the foundation bolts.
I like sparks.



Picture below, the round black disks are spacers that keep potential rot from spreading from a deck to the house.

My neighbor's tree (a chinese pistachio) got cut down. It was a very exciting thing to watch and the guy here has been cutting trees down for 36 years. He shared that he once in his career fell 15' and broke 8 ribs. He said it happened when he realized that a trunk was gonna fall on electrical lines so he pulled on the trunk and fell backwards. This the tree went down very fast. I was impressed.

My house without the tree.
Magic hour.

Man this balcony looks big.

Sunday, January 15, 2012

Roof weather proofed.

 Second floor office balcony.

Bathroom ceiling with leveled sofits.
 Waterproofing has been put onto the roofs to get ready for the coming rain. Possibly Wednensday.



 View of the garage roof below. The materials on it will be the foundation for the green roof that will go on top.

I've been fortunate for the dry weather during my build. Although its not so great for California.

Friday, January 13, 2012

Sealing the roof & Office balcony

The guy on the far left, on the roof, is the roofing guy and his crew are putting in the first components of the water-proofing "stuff."
View of the dinning room and living room area.
This shot below is a late night photo of the balcony.
Will take a better one in the morning.

Thursday, January 12, 2012

Progress

House
Main floor bathroom all in.
Top and bottom of stairway pillar.

Below are shots of the framers adding beams for a level ceiling.

That's all for today.

Wednesday, January 11, 2012

Wednesday morning

 Corrected window opening.

 My Kohler bathtub has arrived. This guy will go down into the basement.
 They've opened up the main bathroom floor to convert it into a wet room. Viewed from the doorway.
The view towards the doorway. See the lower beams.

They're building out the frame work for the bathroom and closet. George (bless his soul) stopped working on the sofits because he recognized that it was creating a weird effect because it sloped too close to the windows. So were gonna level the sofits.
 Bathroom.
 a 180ยบ view
 On the roof deck. Which will be my green roof.
 Again George has caught something that would improve the look of the light panel at the top of the column. I like this guy.

Tuesday morning (late post)

Front
 
Here is the window getting fixed.

Here is the floor of the main floor bathroom getting opened up to be lowered for the wet room.

Upstairs
View of the deck
 
(Below) is a view of the garage area. Not sure why they gouged out that length of SIPs. Will find out soon.
 
Back of house
Ta da.