Wednesday, June 27, 2012

Stucco prep.

Fry Reglets. http://www.fryreglet.com/
Voila.

Wrapped & ready.



The entire house is wrapped in black paper.

Wednesday, June 20, 2012

Update June 20th, 2012.

The yard got cleaned up!
Picture of the sheet metal waterproofing at the entrance way.
Back of the house…
Above, the crew had to remove the sliding door so that the roofers can install waterproofing underneath it. Which kind of stinks because it meant the door had to be installed, uninstalled and then installed again.

Monday, June 18, 2012

June 17th, 2012 Update.

Stucco materials...
House will be wrapped up in black paper soon.
Work in progress.
Later that day...
View of second floor from deck.
The garage roof.
Voila.

Tuesday, June 5, 2012

Windows install almost done.





Finished…








These two photos below are kind of artsy.

Monday, June 4, 2012

Big crane, big windows installed.

Sorry these are crappy photos taken with my iPad. I forgot to put the memory card back into my camera. What a bummer.
Below: one of the large windows being lowered into the basement pond area. I've seen it installed and I love it. I wished I made the pond larger!
Crane operator.
Here they are positioning one of the sliding doors on the second floor bedroom.
Voila.

Sunday, June 3, 2012

June 1st.

Doors!
 
 

Built-in bookshelves.