Tuesday, July 17, 2012

Main Bathroom Floor

The bathroom floor is being prepped for the tiles.
Cool!

The electrician made a mistake and drilled the hole (for another fixture) not aligned with the light fixture on the left. Oops.

Below are baby doves. they have successfully crapped all about my second floor.
They're cute but annoying. amazingly the parents haven't abandoned them.

Thursday, July 12, 2012

Insulation and stuff.

Here are pics of the insulation that has been installed. The product is John Manville (I like the name). http://www.jmhomeowner.com

Front entry.
Guest bedroom.
Basement bathroom.
Basement bathroom; view from bathtub.
Basement 'game' room.
Master bedroom.

Below: the blue tube is the fresh water that will connect to the hose bib in the basement pond.
They had to drill a diagonal hole through the cement to get to the hose bib (see below).
The white panel, next to the grey electrical high voltage panel, is the ethernet and cable TV hub. Cool.

View of the plywood face that will provide structural integrity to the stucco over the green roof curb & eaves.
I'm slowly losing my mind.

Wednesday, July 11, 2012

Update July 11th, 2012

No pics today but they are installing insulation on the interior walls and ceilings. Also found a bird's nest with a chick in the master bedroom. How fun yet sad.

Saturday, June 30, 2012

Green-roof progress








Hallow gap in the garage wall got filled in with foam.
Voilá

Thursday, June 28, 2012

Green roof build-out.





Doors

Main floor.
Main floor - guest bedroom.
Workshop
Basement

Stucco preparation: regelts and wire mesh.