Wednesday, November 7, 2012
Tuesday, November 6, 2012
Monday, November 5, 2012
Sunday, November 4, 2012
Retaining walls for lightwells and main floor.
That stupid swimming pool being annoying again.
Ipe floor almost done on the main floor.
This ipe vent is really nice!
Hmmm.
Thursday, November 1, 2012
Updates, November 1st, 2012.
Lovely pavers!
House is covered in tarp for the rain.
Floor is replaced and I got my 1/4" tubing from the kitchen island to the outside!
Kitchen isalnd
Outside
Bedroom floor is lovely.
Fire sprinkler relocated to inside the garage.
Solar power conduits inside garage.
Garage door opener!
Floor fix
This sounds weird but the best part about this floor repair is that I get to finally run a 1/4" tubing from the kitchen island to outside the house for my Reverse Osmosis.
Cool Ipe stairs!
I think the second landing.
Wednesday, October 31, 2012
Pavers; walkway & driveway
Wow.
Below: colored cement blocks for the retaining walls in light-wells
Here are the pavers.
After they've been placed.
More pics to come.
Subscribe to:
Posts (Atom)





























