Wednesday, November 7, 2012

Stone not working out

Taking the stone down because its not working. Will be going to stucco for now.

Photo update:

Well, you roll the dice and sometimes you get snake eyes. Had the stone worked it would have been a big savings. You live and learn.
There go thousands down the drain.

Tuesday, November 6, 2012

Stone cladding update

Stone cladding on house.

Monday, November 5, 2012

Stone cladding

Stone cladding for stairway exterior walls.

Sunday, November 4, 2012

Retaining walls for lightwells and main floor.

 That stupid swimming pool being annoying again.

Ipe floor almost done on the main floor.

 This ipe vent is really nice!
Hmmm.

Thursday, November 1, 2012

Updates, November 1st, 2012.

 Lovely pavers!

House is covered in tarp for the rain.

 

Floor is replaced and I got my 1/4" tubing from the kitchen island to the outside!
Kitchen isalnd
 Outside

Bedroom floor is lovely.

Fire sprinkler relocated to inside the garage.
 Solar power conduits inside garage.
 Garage door opener!

Floor fix

This sounds weird but the best part about this floor repair is that I get to finally run a 1/4" tubing from the kitchen island to outside the house for my Reverse Osmosis.



Cool Ipe stairs!
I think the second landing.

Wednesday, October 31, 2012

Pavers; walkway & driveway

 Wow.
 Below: colored cement blocks for the retaining walls in light-wells
 Here are the pavers.
After they've been placed.
More pics to come.