Thursday, October 11, 2012

Electrical trim, final stucco and more.

Luan wall.
 Tile fixed.
 Fancy face-plates for electrical trim.
 Electrical and ethernet hub.
 View of glass brick floor unfinished.
 Closer view of luan wall corner. It'll need to be polished up a bit.
 Lovely color of final stucco finish.
Cool.

Friday, October 5, 2012

Update October 5th, 2012

I see that the water & sewer are connected and trenches are buried.
I missed the photo op on the pipes.
Hose bib.
 

Glass floor.
Damaged tile. I guess the opening was too small and it had to be cut open.


Roof top. The footings are for the solar panels.

Garage Door!!

Thursday, October 4, 2012

Second Floor Glass Bricks

Bricks are going in.

Wednesday, October 3, 2012

Trench & glass blocks

CleanSolar came to start the install but ran into problems.

They dug out the trenches needed to run the new water and sewer.

Glass bricks going in.
Hmmm.

Friday, September 28, 2012

Floor & patches.

The IPE floor has been dropped off at the house to aclimatize for 10 days.

Luan wall in kitchen.

 Dry wall gets patched up.
 all over the house.
Hmmm.

Tuesday, September 25, 2012

Door and choice.

 The frosted panel today got swapped into the correct place in the door.
I am going with the screw-less brush-metal plate and black receptacle. Expensive.

Saturday, September 22, 2012